« PreviousNext »

LPMG Shoring & Support

Supporting/Shoring

Atlantic City, NJ / February 2016

We supported and leveled up each of the floors in this five-story building. Each of the five floors had areas that needed lifted and leveled and then beams and posts replaced. The Buckingham Jacking/Shoring Posts worked perfectly for the job.

Specs

Lifted and leveled on five floors

Beams and posts replaced

Lift completed with Buckingham Hydraulic Shoring Posts