Atlantic City, NJ / February 2016

We supported and leveled up each of the floors in this five story building. Each of the five floors had areas that needed lifted and leveled and then beams and posts replaced. The Buckingham Jacking/Shoring Posts worked perfectly for the job.

Specs

Lifted and leveled on five floors

Beams and posts replaced

Lift completed with Buckingham Hydraulic Shoring Posts