Wolfe House Movers rigged and transported this transformer 1 mile down the road to the new substation. The unit was trans-loaded from a railcar onto the Buckingham Beam & Dolly System and set onto the new foundation pad with a Jack & Slide System. The transformer was 30’10” x 11’6″ x 13’2″ and weighed 238,500 lbs.

Specs

Transformer

238,500 lbs

Moved 1 Mile