Wolfe provided full shoring, bracing, and lifting services for a 28’x108′ section of this three-story brick warehouse while the outer wall was demoed and replaced. We installed Buckingham jacking-shoring posts on each story of the building, cross-braced them, and and tied each floor and the roof to helical pile anchors to protect the exposed area from wind shear. When everything was secured, we used the hydraulic capabilities of the jacking-shoring posts to lift each floor a few inches and level them.
Supported Three Floor Levels
Installed Helical Anchors & Cable Bracing
Lifted Building 4"