Wolfe provided shoring and remedial jacking for a 4-story concrete and frame building in Kansas City. Wolfe installed over 100 Buckingham jacking-shoring posts on the second floor of the building to shore a 37’x200′ section of the concrete floor system. After the shoring was in place, they used a unified jacking machine with the jacking-shoring posts to level the compromised section of floor.
Shored 7,400 Sq Ft of Building
Lifted Portion of Concrete Floor System