Accelerated Bridge Construction

Allentown, PA / September 2019

Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction
Allentown Bridge Construction

Rigging/Heavy Hauling

Allentown, PA / September 2019

Buckingham Transport and Wolfe House Movers recently assisted with the replacement of a Pennsylvania Turnpike Bridge by hauling away the older sections that were being replaced and hauling in pre-built sections to be set into their places. This process, known as “Accelerated Bridge Construction”, was completed over a single weekend. Normally, this type of project would take 6 months but under the accelerated time-frame, Buckingham teamed up with J.D. Eckman (the project General Contractor) to make it happen in a much shorter time. The new 280,000 lb pre-built bridge sections were loaded onto the Buckingham Power Dolly Transporters and Goldhofer STZ-P9 trailers ahead of time and staged just down the road in preparation. Once the existing bridge sections were removed and hauled away, the new pieces were moved into place for a crane to pick them up and place them into the final position. Due to the Accelerated Bridge Construction, the Turnpike was shut down only 55 hours rather than the 6 months of restricted traffic flow.

Watch a Video of the Move

 

Specs

94'x16' Sections of Steel and Concrete

Each Bridge Section weighed 280,000 lbs

Accelerated Bridge Construction done over a 55-Hour period