Gettysburg Home Repositioned for the Future

Gettysburg, PA / June 2026

shot of home on steel in its original location.
Behind shot of the home with steel and cribbing underneath.
Shot of the home in the process of being moved.
Shot of the home moving to its new position
Drone shot of the side of the home moving to its new location.
Drone aerial footage of the home in Gettysburg, PA.
Top view of the home in its new location.
Photo the dollies getting positioned at it the homes new location.
Ground level shot of the home in its new location
Photo of the home positioned next to the Dobbin House restaurant in Gettysburg..
The home in its new location and positioned correctly with foundation built up.
shot of home on steel in its original location.
Behind shot of the home with steel and cribbing underneath.
Shot of the home in the process of being moved.
Shot of the home moving to its new position
Drone shot of the side of the home moving to its new location.
Drone aerial footage of the home in Gettysburg, PA.
Top view of the home in its new location.
Photo the dollies getting positioned at it the homes new location.
Ground level shot of the home in its new location
Photo of the home positioned next to the Dobbin House restaurant in Gettysburg..
The home in its new location and positioned correctly with foundation built up.

Services

Gettysburg, PA / June 2026

Wolfe House Movers was privileged to assist with a special project in Gettysburg, Pennsylvania: moving a historic home across its site without compromising its structural integrity or historic character.

Situated beside the historic Dobbin House Tavern, the building occupied space the owners planned to transform into a commemorative public park. What followed was a relocation that combined historic preservation with modern structural moving technique, allowing the site to be reimagined while keeping the home’s legacy intact. 

Wolfe installed the Buckingham Power Dolly System beneath the 34′ x 43′, 2 ½-story frame building and connected the dollies to a power unit staged on the rear porch. Using the Buckingham SmartSteer® System, Wolfe’s operator drove the 96-ton structure across the site, maintaining stability on the sloped terrain and rotating the building for alignment over the newly prepared footings. 

After the foundation walls were completed, Wolfe returned to lower the home onto its permanent foundation, completing a relocation that preserved a historic structure while opening space for the new public park.

Specs

Circa‑1890s Frame Home

96-Ton Structure

2.5-Story Residence

Relocated Backwards on the Property